Following steps to be taken to change the glass:
- Isolate the level gauge from process from HP and LV valve.
- Drain the level gauge process fluid from drain isolation valve.
- Insure no leakage occurred from HP and LP valves.
- Remove the all U-Clamp bolt and removed the glass and gasket and make smooth the surface of chamber and cover flange surface.
- Fix the sealing gasket after some grease applied on chamber window surface. By applying the grease it is easy net time to remove the gasket on next time.
- Fix the mica sheet in case of transparent glass.
- Fix the glass then fix cover flange and cushion gasket then fix the U-Clamp and bolt .
- Tighten the bolt in cross direction. Never tighten the bolt in one direction if tight the glass one direction then possibility to break the glass.
- Tighten the all U-clamp bolt equally.
This article comes from inst tools edit released